logo

Crypto Mining Firm Hut 8 Receives $330 Million Credit Support for 1.5GW Capacity Expansion Plan

By: theblockbeats.news|2025/08/26 15:22:14

BlockBeats News, August 26th, according to theminermag report, Hut 8 plans to develop four large-scale infrastructure projects in the United States, advancing a total of 1530 megawatts (MW) in capacity, as part of its expansion from Bitcoin mining to a broader digital infrastructure strategy. These new projects span Louisiana, Texas, and Illinois, with capacities ranging from 50 MW to 1000 MW, bringing Hut 8's potential pipeline capacity to over 10 GW. Once operational, this latest expansion will increase Hut 8's managed platform capacity to 19 sites, exceeding 2.5 GW.


To support this construction plan, Hut 8 is leveraging various financing channels, including a new $200 million revolving credit facility with digital asset investment firm Two Prime and a $130 million credit facility with Coinbase for expansion and repricing.

“Machi” pierde 1573 millones de dólares en 35 días; actualmente tiene pérdidas flotantes de 227 millones de dólares en posición larga con apalancamiento de 25 veces

También te puede gustar

Compartir
copy

Ganadores

Últimas noticias cripto

17:52

Cierta dirección de ballena ha depositado 10 millones de U en HyperLiquid, iniciando una posición larga de 20x ETH.

17:21

Coinbase to List Rayls (RLS)

16:53

Spot Silver Surges Over 3% Intraday

16:51

Circle acuñó 7.500 millones de USDC en la red Solana en los últimos 5 minutos.

16:25

En las últimas 4 horas, toda la red ha visto liquidaciones por $320 millones, con la mayoría de ellos provenientes de posiciones largas.

Más información
Comunidad
icon
icon
icon
icon
icon
icon
icon

Atención al cliente@weikecs

Cooperación comercial@weikecs

Trading cuantitativo y MM[email protected]

Servicios VIP[email protected]