Crypto Mining Firm Hut 8 Receives $330 Million Credit Support for 1.5GW Capacity Expansion Plan
BlockBeats News, August 26th, according to theminermag report, Hut 8 plans to develop four large-scale infrastructure projects in the United States, advancing a total of 1530 megawatts (MW) in capacity, as part of its expansion from Bitcoin mining to a broader digital infrastructure strategy. These new projects span Louisiana, Texas, and Illinois, with capacities ranging from 50 MW to 1000 MW, bringing Hut 8's potential pipeline capacity to over 10 GW. Once operational, this latest expansion will increase Hut 8's managed platform capacity to 19 sites, exceeding 2.5 GW.
To support this construction plan, Hut 8 is leveraging various financing channels, including a new $200 million revolving credit facility with digital asset investment firm Two Prime and a $130 million credit facility with Coinbase for expansion and repricing.
También te puede interesar
Ganadores
Últimas noticias sobre criptomonedas
BlackRock: Tokenization is evolving at a pace comparable to the early Internet, poised for significant growth
Whale "pension-usdt.eth" yesterday saw its ETH long position fall below the average price, with a position size reaching $56 million.
Dark Pool DEX HumidiFi to Launch ICO, Leading in Trading Volume Among Solana Ecosystem DEXs
「Bankrupt」 trader James Wynn opened a new 40x leverage BTC long position. Last week, he predicted that BTC would drop to $67,000 within the week.
DeFi protocol Zoo Finance has announced the completion of an $8 million strategic fundraising round.
Atención al cliente:@weikecs
Cooperación empresarial:@weikecs
Trading cuantitativo y MM:[email protected]
Programa VIP:[email protected]