logo

Crypto Mining Firm Hut 8 Receives $330 Million Credit Support for 1.5GW Capacity Expansion Plan

By: theblockbeats.news|2025/08/26 15:22:14

BlockBeats News, August 26th, according to theminermag report, Hut 8 plans to develop four large-scale infrastructure projects in the United States, advancing a total of 1530 megawatts (MW) in capacity, as part of its expansion from Bitcoin mining to a broader digital infrastructure strategy. These new projects span Louisiana, Texas, and Illinois, with capacities ranging from 50 MW to 1000 MW, bringing Hut 8's potential pipeline capacity to over 10 GW. Once operational, this latest expansion will increase Hut 8's managed platform capacity to 19 sites, exceeding 2.5 GW.


To support this construction plan, Hut 8 is leveraging various financing channels, including a new $200 million revolving credit facility with digital asset investment firm Two Prime and a $130 million credit facility with Coinbase for expansion and repricing.

Qian Zhimin, o mestre de um caso de branqueamento de dinheiro envolvendo 60.000 BTC, foi comprado por um preço médio de 2815 CNY. Amanhã, será realizada uma audiência sobre a disposição dos ativos congelados relacionados ao caso.

Também poderá gostar de

Partilhar
copy

Em alta

Últimas notícias cripto

23:53

Fed Futuras Reuniões Risco Vendo Incremento de Disputas Aumentando a Volatilidade do Mercado

23:51

Tom Lee: BTC e ETH Ratio Risk-Reward se tornando bastante atraente

23:49

O Coinbase agora está ao vivo com a negociação spot da Rayls (RLS)

17:51

Um determinado endereço de baleia depositou 10 milhões U em HyperLiquid, iniciando uma posição 20x ETH longa.

17:21

Coinbase to List Rayls (RLS)

Ler mais
Comunidade
icon
icon
icon
icon
icon
icon
icon

Apoio ao cliente@weikecs

Cooperação empresarial@weikecs

Trading quant. e criação de mercados[email protected]

Serviços VIP[email protected]